YAMAL LNG

25.06.2017

YAMAL LNG

YAMAL LNG is an integrated project for the extraction, liquefaction and supply of natural gas, is being implemented on the Yamal peninsula beyond the Arctic Circle on the basis of the Yuzhno-Tambeyskoye field. The project provides for the construction of a plant for the production of liquefied natural gas (LNG) with a capacity of about 16.5 million tons per year. Proved and probable gas reserves of the field according to PRMS standards are 926 billion cubic meters. In the framework of the project, a transport infrastructure is being created, including the seaport and Sabetta airport.

At the Yuzhno-Tambeyskoye field, production drilling is conducted using advanced technologies. The project of the field development provides drilling of more than 200 directional production wells with a horizontal termination from 19 cluster sites.

YAMAL LNG is currently one of the largest and most complex projects under construction in the world!

Our company Stroi Techno Engineering has been honored to participate as a contractor on an object of this scale. Currently, a well-coordinated team of specialists is actively working at the facility, each of them being a professional in his field! At the facility, the STI carries out installation work on ventilation at the compressor station. Specific work is the installation of almost 100 tons of stainless steel ducts with a thickness of 3 mm.

A distinctive feature of STI company is reliability, advanced technologies and quality of work. To date, the track record of the STI includes a number of facilities that are in operation, which operate at the highest level. We are always ready for a long and fruitful cooperation. Unique professional experience allows our engineers to work on objects of any complexity.